kfrank4
06-25-2004, 11:24 PM
I have done the research on this board that shows electrical loads for phase three ops.
the mat I am looking at has 3 phase 400 amp service. My question is this, with my equipment mixture (shown below), can I add 10 double stack dryers no problem? Also, I need to have the new stacks on a wall that has no gas or electrical at this time. If I get rid of the smaller stacks, do I need to rip out the electrical and gas plumbing for them? Should I or can I just leave them in? space is not an issue. Thanks K
Did I mention how great this forum is?
IT has 16 maytag TL
3 35# maytags
4 35# milnor
2 50# milnor
1 50# maytag
1 50# wasco
5 juniorw74 wasco
10 maytag stacked dryers so 20 (small 22lb cap)
4 huebsch 30# single dryers
the mat I am looking at has 3 phase 400 amp service. My question is this, with my equipment mixture (shown below), can I add 10 double stack dryers no problem? Also, I need to have the new stacks on a wall that has no gas or electrical at this time. If I get rid of the smaller stacks, do I need to rip out the electrical and gas plumbing for them? Should I or can I just leave them in? space is not an issue. Thanks K
Did I mention how great this forum is?
IT has 16 maytag TL
3 35# maytags
4 35# milnor
2 50# milnor
1 50# maytag
1 50# wasco
5 juniorw74 wasco
10 maytag stacked dryers so 20 (small 22lb cap)
4 huebsch 30# single dryers